What We Do

Services

Here's the full list of deck work we take on, from a small rail repair to a full build.

HomeServices

Everything we take on

Every job below is one we do ourselves across Mesa.

Deck Installation

We build new decks from the footings up, sized and framed to the load and span your design calls for. Posts go on poured concrete footings set below grade, not surface brackets, so the structure doesn't shift as the soil moves. We frame with pressure-treated joists at 16 inches on center unless the design calls for tighter spacing.

Deck Repair

Soft spots, bouncy boards and rails that wiggle usually trace back to a rotted joist, a ledger board that's pulled loose, or fasteners that have backed out over time. We replace what's failed instead of just screwing the surface back down, because a cupping board is often telling you something underneath it is wet.

Deck Staining & Sealing

Arizona sun bleaches and dries out wood fast, and a cheap stain job can look chalky within a year. We strip or clean the old finish first, let the wood dry fully, then apply a stain and sealer rated for UV exposure, not just a hardware-store gallon can.

Custom Deck Design

Some decks need to wrap around a pool, carry a hot tub, or step down a slope, and that changes the footings, joist spacing and railing layout before a single board goes down. We work out the load and the layout with you up front, so the design matches how you actually plan to use the space.

Composite Decking Installation

Composite boards don't rot, splinter or require restaining every couple of years, which matters if you don't want to be out there with a sander every spring. We install with hidden fastener clips so there's no screw heads on the surface, and we leave the gap the manufacturer specs for thermal expansion, since composite moves more than wood does in our heat.

Deck Railing Installation

Guardrail height, baluster spacing and post connections are all called out in code, and we build to those numbers, not to what looks close enough. We run structural screws through the post rather than face-nailing, so the rail doesn't loosen up after the first monsoon season.

Deck Resurfacing & Board Replacement

If the frame underneath is still solid but the decking on top has cupped, split or gone gray past saving, we'll pull the old boards and resurface without rebuilding the whole structure. It's faster and costs a lot less than a full rebuild, as long as the joists check out underneath.

Pergolas & Shade Structures

Bare decking in full Arizona sun gets too hot to use most of the year, so we build pergolas and shade structures sized to the deck footprint. We tie the posts into the deck framing itself instead of just anchoring to the surface boards, so wind load goes where the structure can actually handle it.

Deck Demolition & Removal

Sometimes the cheapest path forward is tearing out what's there and starting clean, especially if the frame's rotted through or was never built to code. We haul off the old lumber and sweep the yard for screws and nails before we leave, whether or not we're the ones rebuilding it.

Deck Safety Inspections

If you're buying a house with an existing deck, or you just don't trust the one you've got, we'll check the footings, ledger connection, joist condition and railing before you find out the hard way. You get a straight answer on what's fine, what needs attention soon, and what shouldn't be stood on until it's fixed.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Mesa, AZ

We build and repair decks throughout the East Valley.

Mesa, AZ
Phoenix, AZ
Chandler, AZ
Gilbert, AZ
Scottsdale, AZ
Tempe, AZ
Queen Creek, AZ
San Tan Valley, AZ
Apache Junction, AZ
Fountain Hills, AZ
Gold Canyon, AZ
Common Questions

Things worth asking

Questions that come up once a deck project is underway.

Do I need a permit to build a deck in Mesa?
Most new deck construction attached to a house or elevated more than 30 inches requires a building permit in Mesa, covering footings, framing and guardrail height. Simple ground-level platforms under a certain size may be exempt, but it's worth confirming with the city rather than assuming a project doesn't need one.
How long does it take to build a new deck?
A straightforward deck of a few hundred square feet typically takes one to two weeks of on-site construction once permits are approved, not counting the permit review time, which can add several weeks. Custom designs with multiple levels, built-in features or a pergola take longer.
Can you work within a set budget instead of a full custom design?
Deck size, decking material and railing style can all be adjusted to fit a target budget, and a good contractor should show what each choice adds or saves before finalizing the design. Pressure-treated pine costs less upfront than composite, though composite avoids the recurring cost of restaining.
Do you guarantee your deck work?
Workmanship should be covered under a warranty period specified in the written contract, separate from manufacturer warranties on the decking material or fasteners themselves, which are typically much longer. Ask for both warranty terms in writing before work begins.
Who do I deal with day to day during the project?
On most residential deck jobs, homeowners deal directly with the crew lead or the contractor running the job rather than a separate office contact, which makes it easier to flag a layout or material question as it comes up. Larger crews may still route billing and scheduling through a separate office line.
What decking material options are there besides pressure-treated wood?
Options besides pressure-treated pine include cedar, redwood, and composite materials like Trex or TimberTech, each with different costs, upkeep and lifespans. Composite costs more upfront but doesn't require restaining, while cedar has a warmer look but requires more upkeep in full sun.
Can I still use my yard while the deck is being built?
Yard access is usually limited near the immediate work area for safety, especially during framing and concrete footing work, but most of the property stays usable during construction. Homeowners with pools or pets should expect a work zone with tools, lumber and open footing holes until the frame is complete.
What do I need to do to prepare the site before work starts?
Clearing furniture, planters, grills or other items from the work area, and keeping the yard accessible for material delivery, helps a deck project start on schedule. Underground sprinkler lines or utilities near the footing area should be marked ahead of time to avoid delays or damage.
What happens if you find a problem once the old deck is torn off?
Rotted ledger boards, undersized footings, or termite damage sometimes only show up once old decking and framing are removed, and that can change the scope and cost of the job. A contractor should stop and explain what was found and what it costs to fix before proceeding, not just build over it.
How do I take care of a new deck once it's built?
Wood decks require restaining every one to three years depending on sun exposure, with west and south-facing sections usually fading fastest in Arizona. Composite decking requires periodic washing to keep dust and hard water spots from building up, but doesn't require refinishing.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (480) 680-9403